Features of this project:
Project background:
Together with Ilp2, preparation of the design already started in 2018. Also, our 335mm wide drainage over 120 meters was already installed on the Amperbrücke in 2018 to gain experience for this 7x larger Luitpold bridge in Freising.
Another innovation was also integrated into this project; dry weather drainage. A 15mm high rib in the center of our 350mm wide unit ensures that during light rainstorms sufficient flow velocity creates the drainage system. During heavier rainstorms, the precipitated sediment can be flushed out of the units at an accelerated rate and reach the sand trap units on the abutmentIn the region around Munich, 6 projects have now been realized with our drainage solution. The clients the city of Regenburg, Freising , Munich and Autobahn GMBH are very satisfied with the application of the Bridge drainage Kerb solution!
Learn more about this project or interested in starting one?