Features of the project:
Advantages over regular drainage
The drainage problem of this bridge was completely solved with the Bridge Drainage units. By integrating the drainage into the tires, this existing bridge could be realized 80 cm slimmer. Also, the maintenance of the drainage system will be able to take place completely on the bridge deck. In addition, 300% weight was saved in the drainage line.
Google streetview
Get a view on the project with street view