Busbridge
(NL) Zwolle

Bus bridge Zwolle

Features of this project:

  • Composite drainage system intergration into the design
  • 60 cm space saving in the guardrail to guardrail
  • Maintenance from the bridge deck
  • Weight saving through light material used
  • Drainage disappears directly from the road deck
  • 182,000 recycled plastic bottles were used during this project.


Advantages over regular drainage:

By integrating the drainage system into the kerbs, this bridge could be realized 60 cm slimmer. Many points were also scored in the EMVI by being able to carry out the maintenance of the drainage system entirely from the bridge deck. In addition, 300% weight was saved in the drainage kerb line.