A11 Connection
Brugge - Zeebrugge (BE)

A11 Brugge - Zeebrugge

Features of this project:

  • The maintenance of the drainage of a bridge entirely on the bridge deck
  • No more hanging pipes under the bridge deck
  • Composite drainage system intergration into the design
  • 60 cm space savings in width
  • Maintenance from the bridge deck
  • Weight saving through lightweight material
  • improved road safety through rapid drainage


Advantages over regular drainage:

By integrating the drainage into the tires, this bridge could be realized 60 cm slimmer. No more piping system under or in the bridge! Instead of having a hole every 10 meters, this is centrally integrated in the construction, making installation very easy. Maintenance only twice a year.

View flyer

Impressions

more information?

More information about this project or interested in starting one?
Then get in touch with us!


Contact