Riga
Kekava

Riga Kekava - Latvia

Features of this project:

  • 12 bridges with a total length of 880 meters with Bridge Drainage Composite Units
  • Rainwater leaves the road surface directly
  • Prevents aquaplaning
  • Easy maintenance from the road surface
  • Lightweight units provide cost savings during installation and also weight savings on the bridge deck
  • No more cast-iron gullies and pipes under and in the bridges.

Project Background:

The consortium of contractors was tasked with integrating proven innovations such as the bridge kerb drain into their design and project in all aspects. In mid-2021, we were approached by the consortium and their engineers. The Bridge drainage engineering team worked with consortium to design a suitable 295mmx150mm solution that provide stormwater drainage on both sides of the bridge deck. The design brief embraced climate proof drainage of all bridge decks based on a rainfall event that occurs once every 50 years!

Impressions

More information?

Learn more about this project or interested in starting one?
Then contact us!

Contact us